How we fit the kit ~ Isolate gas & electrics, disconnect the injector and housing kit from the Venturi’ - fit the new sensor to the heat exchanger in the existing screw hole and connect the two spade connectors, disconnect a spade off the water pressure switch & connect into one of new kit connections - put the other new connecter back on the water pressure switch and reassemble everything.
Un isolate and then carry out gas and flue testing to sign the kit off.
Copyright © 2024 GHR Energy - All Rights Reserved.